HOLDREGE, Neb. – The Central Nebraska Public Power & Irrigation District announced today that the fall hydrocycling period at the Johnson No. 2 Hydroplant, located south of Lexington, will begin Oct. 17 and continue through Nov. 10.
During hydrocycling, Johnson Lake water levels may fluctuate by as much as two feet as operations are adjusted to minimize the rate of flow changes into the Platte River. Hydrocycling occurs each spring and fall in accordance with an agreement with the U.S. Fish & Wildlife Service.
In addition, an approximately 4-5 feet drawdown of Johnson Lake is planned to start on November 24 to assist with the removal of carp from the lake. It was originally scheduled around Thanksgiving weekend to allow for replacement of the Phelps Canal head gate downstream of the J-2 Hydroplant. Lake levels are expected to return to normal operating levels by mid-December.
Additional information about Johnson Lake operations and hydrocycling is available on Central’s website at https://cnppid.com/operations/johnson-lake-operations.